GENERAL COST ESTIMATION

Labour Cost calculator

Hours, crew size and the cost of labour.

YOUR MEASUREMENTS

Labour Cost

↗
↻ Results update as you type
YOUR ESTIMATELIVE
Total labour cost
€720
Total person-hours24 hours
CONNECT TO COST, LABOUR & BOQ
Open BoQ ↗

An estimate for planning. Currency selection changes the display symbol only (no exchange-rate conversion). Verify measurements and product specifications before ordering.

THE FORMULALabour cost = hours per worker × hourly rate × workers
ASSUMPTIONSAssumes every worker works the same hours at the same rate. Enter a fully burdened rate if you want employment costs included. Overtime, travel, allowances and productivity are separate.
UNDERSTAND YOUR ESTIMATE

How to use the labour cost calculator

This calculator helps you estimate labour costs from hours per worker, hourly rate and crew size. It is intended for quantity takeoffs, early budgets and checks against a measured schedule. Start with the dimensions or quantities for one clearly defined item of work. Enter values in the units shown beside each field; millimetres and metres are not interchangeable.

Assumes every worker works the same hours at the same rate. Enter a fully burdened rate if you want employment costs included. Overtime, travel, allowances and productivity are separate.

Step-by-step takeoff workflow

  1. Enter your measured dimensions and inputs: Input the project values for Hours per worker (hours), Hourly rate (selected currency), Number of workers. Check that every measurement uses the exact unit shown beside its field.
  2. Review the live quantity and formula calculation: The calculator applies Labour cost = hours per worker × hourly rate × workers immediately in your browser and displays the primary and secondary takeoff figures.
  3. Carry forward to cost, BoQ, CSV or printable takeoff sheet: Send your calculated quantity directly to Concrete Cost, Markup / Margin or the Bill of Quantities (BoQ) worksheet, or export via CSV and Print / PDF.

Worked example

Three workers each working eight hours at 30 per hour cost 720, equivalent to 24 person-hours.

Quick-reference lookup table

Quick reference: Daily construction crew labour cost (8-hour shift) by gang size and hourly rate
Crew size (workers)Daily person-hours (8 h)At 25 / hourAt 30 / hourAt 40 / hour
1 operative8 hours200 / day240 / day320 / day
2-person gang16 hours400 / day480 / day640 / day
3-person gang24 hours600 / day720 / day960 / day
4-person gang32 hours800 / day960 / day1,280 / day
6-person gang48 hours1,200 / day1,440 / day1,920 / day

Before you order

Compare the result with your drawings and supplier information. Keep the original net quantity separate from allowances, and round purchasing quantities only at the ordering stage. Check whether delivery, labour and related materials belong elsewhere in your estimate. If the drawing or specification changes, update the inputs and record the revised basis instead of reusing an earlier total.

For the concepts behind this calculation, read Rate Build-Up, Unit Rate, Overheads and Profit.

Common questions & estimating checks

What formula does the labour cost calculator use?

Labour cost = hours per worker × hourly rate × workers — Assumes every worker works the same hours at the same rate. Enter a fully burdened rate if you want employment costs included. Overtime, travel, allowances and productivity are separate.

How do you work out a labour cost example?

Three workers each working eight hours at 30 per hour cost 720, equivalent to 24 person-hours.

Which inputs and units are required for this calculation?

You enter Hours per worker (hours), Hourly rate (selected currency), Number of workers. Keep metres and millimetres distinct, and use the header currency selector to display monetary amounts in EUR, GBP, USD or a custom currency code.

What should I check before ordering materials from a labour cost estimate?

Verify dimensions against approved construction drawings, confirm supplier pack sizes and product yields, and keep net measured quantities separate from cutting or site wastage allowances.