General Cost Estimation
Practical quantities, clear assumptions and the terms behind them.
How to approach general cost estimation quantities
Commercial estimating links measured quantities to unit rates, labour gangs, floor-area benchmarks, Bills of Quantities (BoQ) and contractor overheads and margin. Keeping direct costs separate from markup or margin prevents pricing errors.
- Verify whether floor-area rates use gross internal area or another defined measurement basis.
- Include employer on-costs and allowances when building up a fully burdened hourly labour rate.
- Distinguish markup on cost from gross margin on selling price when pricing tenders.
- Keep preliminaries, design contingency and tax outside trade unit rates unless stated.
Need a full Bill of Quantities (BoQ) worksheet?
Combine concrete, rebar, masonry, earthworks and labour quantities into one structured project schedule with CSV and A4 PDF export.
Cost Per m² / Sq Ft
Benchmark a project, or build a budget from a rate.
General Cost EstimationLabour Cost
Hours, crew size and the cost of labour.
General Cost EstimationMarkup / Margin
Price a job without mixing up markup and margin.
General Cost EstimationCommon questions on general cost estimation estimating
What is the difference between a 20% markup and a 20% gross margin?
A 20% markup adds 20% to your cost (1,000 × 1.20 = 1,200, which yields a 16.67% margin). A 20% margin requires profit to equal 20% of the final selling price (1,000 ÷ 0.80 = 1,250, which is a 25% markup on cost).
What should be included in a fully burdened construction hourly labour rate?
Beyond base hourly pay, a burdened rate accounts for employer payroll taxes, holiday pay, pension contributions, insurances, small tools, PPE and non-productive allowances.