FREE CONSTRUCTION & QUANTITY-SURVEYING CALCULATORS

Less guesswork.
More groundwork.

Free construction and quantity-surveying calculators — from your first concrete, rebar or masonry takeoff to material cost, crew labour, markup and a complete Bill of Quantities (BoQ) worksheet.

26 purpose-built tools + BoQ worksheetEvery formula, explainedNo sign-up
LENGTHWIDTHD
FIG. 01 — GET THE BASICS RIGHTV = L × W × D
THE EVERYDAY ESSENTIAL

Concrete Volume calculator

▱
↻ Results update as you type
YOUR ESTIMATELIVE
Net concrete volume
3.6m³
Cubic yards4.709 yd³
Whole bags to buy300 bags
Order volume (incl. wastage)3.6 m³
CONNECT TO COST, LABOUR & BOQ
Open BoQ ↗

An estimate for planning. Currency selection changes the display symbol only (no exchange-rate conversion). Verify measurements and product specifications before ordering.

THE FORMULANet volume = length × width × depth; order volume = net × (1 + wastage / 100)
ASSUMPTIONSDimensions describe one rectangular solid. Imperial inputs are in feet. Net volume is shown separately from your optional wastage allowance (0% by default). Bag yield is editable: 0.012 m³ for a 25 kg bag and 0.0085 m³ for a 40 lb bag are illustrative defaults, not manufacturer guarantees.
01 / 26 · Concrete StructuresView assumptions & calculation guide ↗
THE RIGHT TOOL FOR THE JOB

What are you building?

▱↗

Concrete Volume

Slabs, bases and pours. Get the volume right.

Concrete Structures
▱↗

Concrete Cost

Turn your concrete quantity into a material budget.

Concrete Structures
▱↗

Concrete Column

Round or rectangular columns, by the pour.

Concrete Structures
▱↗

Concrete Beam

Concrete and three-sided formwork for beams.

Concrete Structures
▱↗

Concrete Wall

Wall volume and formwork on both faces.

Concrete Structures
▱↗

Concrete Slab

Concrete, bag counts and mesh coverage.

Concrete Structures
▱↗

Concrete Stairs

A solid stepped block, measured tread by tread.

Concrete Structures
⌑↗

Strip Footing

Continuous footing volume and longitudinal bars.

Foundations
⌑↗

Pad / Spread Footing

Quantities for one pad or a repeated foundation.

Foundations
⌑↗

Pile Cap

Rectangular pile-cap concrete and steel allowance.

Foundations
╬↗

Rebar Weight

Convert bar diameter and total length into kilograms.

Reinforcement
╬↗

Rebar Quantity

Bar counts, total weight and a material allowance.

Reinforcement
╬↗

Rebar Lap Length

Explore a stated lap-length assumption.

Reinforcement
▦↗

Brickwork

Masonry units and a geometric mortar allowance.

Masonry & Finishes
▦↗

Blockwork

Masonry units and a geometric mortar allowance.

Masonry & Finishes
▦↗

Plastering / Render

From coverage and thickness to mix and bags.

Masonry & Finishes
▦↗

Screed

From coverage and thickness to mix and bags.

Masonry & Finishes
▦↗

Paint Coverage

Paint quantities, coats and whole cans.

Masonry & Finishes
▦↗

Tile & Grout

Tile counts and joint-fill volume.

Masonry & Finishes
◩↗

Excavation Volume

Dig volume, loose spoil and truckloads.

Earthworks
◩↗

Backfill

The void left after the structure is in place.

Earthworks
⊞↗

Timber Stud

A straight wall’s basic stud count.

Timber / Framing
⊞↗

Timber Volume / Cost

Member volumes, board feet and material cost.

Timber / Framing
↗↗

Cost Per m² / Sq Ft

Benchmark a project, or build a budget from a rate.

General Cost Estimation
↗↗

Labour Cost

Hours, crew size and the cost of labour.

General Cost Estimation
↗↗

Markup / Margin

Price a job without mixing up markup and margin.

General Cost Estimation
STRUCTURED BY TRADE

Explore all 26 calculators through 7 trade hubs + BoQ

Open Construction BoQ Calculator ↗
KNOW THE QUANTITY. KNOW THE TERM.

34 quantity-surveying & construction glossary terms

Plain-English definitions, contractual context and worked examples linked directly to the calculators.

Open full QS glossary ↗