GENERAL COST ESTIMATION · BILL OF QUANTITIES

Construction Bill of Quantities (BoQ) calculator & project worksheet

Build a multi-line construction Bill of Quantities with separate net and order quantities, trade unit rates, assumptions, preliminaries, contingency, markup vs margin and instant CSV or A4 PDF export.

Measured works line items — net quantities, wastage allowances, unit rates and assumptions
Ref Trade / Category Item description & specification Net qty Waste % Order qty Unit Unit rate (€) Line total (€) Assumptions / drawing ref Remove
18 €630
3.78 €567
233.331 €280
24 €720
COMMERCIAL ALLOWANCES & OVERHEADS

Preliminaries, contingency & margin

Line items sent from any of the 26 calculators via + Add to BoQ worksheet appear automatically in this schedule and persist in your browser.

PROJECT BOQ SUMMARYLIVE
Estimated tender total (excl. tax)
€2,906.85
Measured works subtotal (net of waste: €2,156.66)€2,197
Material wastage allowance included€40.33
Preliminaries (10%)€219.70
Contingency (5%)€109.85
Overheads & profit (15% markup / 13.04% margin)€379.98

Display currency changes the currency symbol only and never converts exchange rates. Verify all quantities, descriptions and contractual measurement rules before tendering.

BOQ ARITHMETICOrder qty = Net qty × (1 + Wastage / 100) · Line total = Order qty × Unit rate · Base cost = Measured works + Preliminaries + Contingency
ASSUMPTIONSNet quantities and wastage percentages are tracked separately; order quantity = net × (1 + wastage / 100). Preliminaries and contingency apply to the measured works subtotal before markup or margin. Currency selection changes the display symbol only (no exchange-rate conversion).
QUANTITY SURVEYING GUIDE

How to use the construction Bill of Quantities (BoQ) calculator

A Bill of Quantities (BoQ) itemises measured construction works by trade, description, unit, net quantity and unit rate so estimators, contractors and clients can price a defined scope transparently. This worksheet connects directly with all 26 calculators on buildcost.tools: calculate a concrete pour, foundation trench, rebar mesh or masonry wall on any tool and click + Add to BoQ worksheet to bring the measured quantity and its assumptions straight into your schedule without re-entering measurements.

Step-by-step BoQ takeoff workflow

  1. Record the measurement basis and drawing revision: Enter the project title, measurement standard (NRM2, SMM7 or custom trade schedule) and drawing revision references so anyone checking the estimate knows which drawings govern.
  2. Keep net measured quantities separate from wastage: Enter the net quantity extracted from drawings in the Net qty column and state your procurement wastage factor in Waste %. The worksheet computes the order quantity and isolates how much of your budget is attributable to material wastage.
  3. Apply preliminaries, contingency and markup or margin: Add project-wide preliminaries and contingency separately from trade unit rates, then select either a markup on cost or a target gross margin (markup vs margin) before exporting to CSV or printing an A4 PDF schedule.

Common questions on construction BoQ estimating

What is the difference between a quantity takeoff and a Bill of Quantities (BoQ)?

A quantity takeoff measures physical lengths, areas, volumes and counts from drawings. A Bill of Quantities structures those measured quantities into standardized trade descriptions with units and rates to produce an extended tender or budget total.

Why should net quantity and wastage percentage be separated in a BoQ worksheet?

When design dimensions change or a different material supplier is selected, keeping net geometric quantities separate from wastage lets you update either the drawing measurement or the wastage allowance without losing your audit trail.

Can I export this Bill of Quantities to Excel or Google Sheets?

Yes. Click Download CSV ⤓ to export a structured comma-separated file containing your project header, every line item (Ref, Trade, Description, Net Qty, Waste %, Order Qty, Unit, Unit Rate, Line Total and Assumptions) and the commercial summary rows.