Unit Rate

QS glossary / Plain-English field notes

ADVERTISEMENT

What does it mean?

A unit rate is the cost or price assigned to one defined unit of work, such as a cubic metre of concrete or a square metre of painting. The description determines what is included. Comparing rates without comparing scope, location, date and conditions can be misleading. Material-only rates and complete installed rates answer different questions.

In practice

At 150 per m³, 3.78 m³ of concrete has a material amount of 567. That figure does not automatically include transport, pumping, placement, finishing, taxes or supplier minimum-load charges.

Keep in mind

For a useful comparison, record the currency, pricing date, scope and exclusions alongside the amount. Separate measured quantities from unit prices so you can identify whether a change comes from design or pricing. Use project-specific quotations where available, and distinguish an illustrative allowance from a confirmed cost. The calculators show arithmetic relationships; they do not supply current market rates, tax advice or a complete project budget.

ADVERTISEMENT
ADVERTISEMENT