FOUNDATIONS

Pile Cap calculator

Rectangular pile-cap concrete and steel allowance.

YOUR MEASUREMENTS

Pile Cap

⌑
↻ Results update as you type
YOUR ESTIMATELIVE
Concrete volume
3.6m³
Cubic yards4.709 yd³
Budget rebar allowance540 kg
CONNECT TO COST, LABOUR & BOQ
Open BoQ ↗

An estimate for planning. Currency selection changes the display symbol only (no exchange-rate conversion). Verify measurements and product specifications before ordering.

THE FORMULAVolume = L × W × D × quantity; steel = volume × assumed kg/m³
ASSUMPTIONSSteel intensity is an editable estimating assumption, not a designed quantity. This rectangular model does not deduct pile heads or model triangular caps.
UNDERSTAND YOUR ESTIMATE

How to use the pile cap calculator

This calculator helps you estimate rectangular pile-cap concrete and a stated steel allowance. It is intended for quantity takeoffs, early budgets and checks against a measured schedule. Start with the dimensions or quantities for one clearly defined item of work. Enter values in the units shown beside each field; millimetres and metres are not interchangeable.

Steel intensity is an editable estimating assumption, not a designed quantity. This rectangular model does not deduct pile heads or model triangular caps.

Step-by-step takeoff workflow

  1. Enter your measured dimensions and inputs: Input the project values for Length (m), Width (m), Depth / thickness (m), Quantity, Assumed reinforcement intensity (kg/m³). Check that every measurement uses the exact unit shown beside its field.
  2. Review the live quantity and formula calculation: The calculator applies Volume = L × W × D × quantity; steel = volume × assumed kg/m³ immediately in your browser and displays the primary and secondary takeoff figures.
  3. Carry forward to cost, BoQ, CSV or printable takeoff sheet: Send your calculated quantity directly to Concrete Cost, Markup / Margin or the Bill of Quantities (BoQ) worksheet, or export via CSV and Print / PDF.

Worked example

Two 2 m × 2 m × 0.8 m caps contain 6.4 m³. At an assumed 150 kg/m³, the budget allowance is 960 kg.

Quick-reference lookup table

Quick reference: Rectangular pile-cap concrete volume and budget steel (at 150 kg/m³)
Pile cap dimensions1 cap volume (m³)2 caps volume (m³)Steel per cap (150 kg/m³)Steel for 2 caps
1.2 m × 1.2 m × 0.6 m0.86 m³1.73 m³130 kg259 kg
1.5 m × 1.5 m × 0.7 m1.58 m³3.15 m³236 kg473 kg
2.0 m × 2.0 m × 0.8 m3.20 m³6.40 m³480 kg960 kg
2.5 m × 2.5 m × 1.0 m6.25 m³12.50 m³938 kg1,875 kg

Before you order

Compare the result with your drawings and supplier information. Keep the original net quantity separate from allowances, and round purchasing quantities only at the ordering stage. Check whether delivery, labour and related materials belong elsewhere in your estimate. If the drawing or specification changes, update the inputs and record the revised basis instead of reusing an earlier total.

For the concepts behind this calculation, read Rebar (Reinforcement Steel), Concrete Grade, Wastage Factor.

Common questions & estimating checks

What formula does the pile cap calculator use?

Volume = L × W × D × quantity; steel = volume × assumed kg/m³ — Steel intensity is an editable estimating assumption, not a designed quantity. This rectangular model does not deduct pile heads or model triangular caps.

How do you work out a pile cap example?

Two 2 m × 2 m × 0.8 m caps contain 6.4 m³. At an assumed 150 kg/m³, the budget allowance is 960 kg.

Which inputs and units are required for this calculation?

You enter Length (m), Width (m), Depth / thickness (m), Quantity, Assumed reinforcement intensity (kg/m³). Keep metres and millimetres distinct, and use the header currency selector to display monetary amounts in EUR, GBP, USD or a custom currency code.

What should I check before ordering materials from a pile cap estimate?

Verify dimensions against approved construction drawings, confirm supplier pack sizes and product yields, and keep net measured quantities separate from cutting or site wastage allowances.