CONCRETE STRUCTURES

Concrete Slab calculator

Concrete, bag counts and mesh coverage.

YOUR MEASUREMENTS

Concrete Slab

▱
↻ Results update as you type
YOUR ESTIMATELIVE
Net concrete volume
3.6m³
Cubic yards4.709 yd³
Whole bags to buy300 bags
Order volume (incl. wastage)3.6 m³
Net single-layer mesh area24 m²
CONNECT TO COST, LABOUR & BOQ
Open BoQ ↗

An estimate for planning. Currency selection changes the display symbol only (no exchange-rate conversion). Verify measurements and product specifications before ordering.

THE FORMULANet volume = L × W × thickness; order volume = net × (1 + wastage / 100); mesh = L × W
ASSUMPTIONSMesh area is net plan area for one layer. It excludes overlaps, cutting loss and additional reinforcement. Net concrete volume is shown separately from any optional wastage allowance. Bag yield depends on the product; check the supplier data.
UNDERSTAND YOUR ESTIMATE

How to use the concrete slab calculator

This calculator helps you estimate net concrete volume, optional wastage, bags and net mesh coverage for a slab. It is intended for quantity takeoffs, early budgets and checks against a measured schedule. Start with the dimensions or quantities for one clearly defined item of work. Enter values in the units shown beside each field; millimetres and metres are not interchangeable.

Mesh area is net plan area for one layer. It excludes overlaps, cutting loss and additional reinforcement. Net concrete volume is shown separately from any optional wastage allowance. Bag yield depends on the product; check the supplier data.

Step-by-step takeoff workflow

  1. Enter your measured dimensions and inputs: Input the project values for Length (m), Width (m), Depth / thickness (m), Wastage allowance (%), Yield per bag (m³). Check that every measurement uses the exact unit shown beside its field.
  2. Review the live quantity and formula calculation: The calculator applies Net volume = L × W × thickness; order volume = net × (1 + wastage / 100); mesh = L × W immediately in your browser and displays the primary and secondary takeoff figures.
  3. Carry forward to cost, BoQ, CSV or printable takeoff sheet: Send your calculated quantity directly to Concrete Cost, Markup / Margin or the Bill of Quantities (BoQ) worksheet, or export via CSV and Print / PDF.

Worked example

A 6 m × 4 m slab at 150 mm thick contains 3.6 m³ net (300 bags at 0.012 m³) and has 24 m² of net mesh coverage per layer.

Quick-reference lookup table

Quick reference: Concrete volume, 25 kg bags and net mesh area for a 150 mm thick slab
Slab dimensionsNet mesh area (m²)Concrete volume (m³)Volume (yd³)25 kg bags (at 0.012 m³)
3.0 m × 3.0 m9.0 m²1.35 m³1.77 yd³113 bags
4.0 m × 3.0 m12.0 m²1.80 m³2.35 yd³150 bags
6.0 m × 4.0 m24.0 m²3.60 m³4.71 yd³300 bags
8.0 m × 5.0 m40.0 m²6.00 m³7.85 yd³500 bags
10.0 m × 6.0 m60.0 m²9.00 m³11.77 yd³750 bags

Before you order

Compare the result with your drawings and supplier information. Keep the original net quantity separate from allowances, and round purchasing quantities only at the ordering stage. Check whether delivery, labour and related materials belong elsewhere in your estimate. If the drawing or specification changes, update the inputs and record the revised basis instead of reusing an earlier total.

For the concepts behind this calculation, read Rebar (Reinforcement Steel), Damp Proof Membrane (DPM), Wastage Factor.

Common questions & estimating checks

What formula does the concrete slab calculator use?

Net volume = L × W × thickness; order volume = net × (1 + wastage / 100); mesh = L × W — Mesh area is net plan area for one layer. It excludes overlaps, cutting loss and additional reinforcement. Net concrete volume is shown separately from any optional wastage allowance. Bag yield depends on the product; check the supplier data.

How do you work out a concrete slab example?

A 6 m × 4 m slab at 150 mm thick contains 3.6 m³ net (300 bags at 0.012 m³) and has 24 m² of net mesh coverage per layer.

Which inputs and units are required for this calculation?

You enter Length (m), Width (m), Depth / thickness (m), Wastage allowance (%), Yield per bag (m³). Keep metres and millimetres distinct, and use the header currency selector to display monetary amounts in EUR, GBP, USD or a custom currency code.

What should I check before ordering materials from a concrete slab estimate?

Verify dimensions against approved construction drawings, confirm supplier pack sizes and product yields, and keep net measured quantities separate from cutting or site wastage allowances.