CONCRETE STRUCTURES

Concrete Volume calculator

Slabs, bases and pours. Get the volume right.

YOUR MEASUREMENTS

Concrete Volume

▱
↻ Results update as you type
YOUR ESTIMATELIVE
Net concrete volume
3.6m³
Cubic yards4.709 yd³
Whole bags to buy300 bags
Order volume (incl. wastage)3.6 m³
CONNECT TO COST, LABOUR & BOQ
Open BoQ ↗

An estimate for planning. Currency selection changes the display symbol only (no exchange-rate conversion). Verify measurements and product specifications before ordering.

THE FORMULANet volume = length × width × depth; order volume = net × (1 + wastage / 100)
ASSUMPTIONSDimensions describe one rectangular solid. Imperial inputs are in feet. Net volume is shown separately from your optional wastage allowance (0% by default). Bag yield is editable: 0.012 m³ for a 25 kg bag and 0.0085 m³ for a 40 lb bag are illustrative defaults, not manufacturer guarantees.
UNDERSTAND YOUR ESTIMATE

How to use the concrete volume calculator

This calculator helps you calculate the net concrete volume, optional wastage allowance and whole-bag quantity for a rectangular pour. It is intended for quantity takeoffs, early budgets and checks against a measured schedule. Start with the dimensions or quantities for one clearly defined item of work. Enter values in the units shown beside each field; millimetres and metres are not interchangeable.

Dimensions describe one rectangular solid. Imperial inputs are in feet. Net volume is shown separately from your optional wastage allowance (0% by default). Bag yield is editable: 0.012 m³ for a 25 kg bag and 0.0085 m³ for a 40 lb bag are illustrative defaults, not manufacturer guarantees.

Step-by-step takeoff workflow

  1. Enter your measured dimensions and inputs: Input the project values for Length (m), Width (m), Depth / thickness (m), Measurement system, Wastage allowance (%), Bag size, Yield per bag (m³). Check that every measurement uses the exact unit shown beside its field.
  2. Review the live quantity and formula calculation: The calculator applies Net volume = length × width × depth; order volume = net × (1 + wastage / 100) immediately in your browser and displays the primary and secondary takeoff figures.
  3. Carry forward to cost, BoQ, CSV or printable takeoff sheet: Send your calculated quantity directly to Concrete Cost, Markup / Margin or the Bill of Quantities (BoQ) worksheet, or export via CSV and Print / PDF.

Worked example

A 6 m × 4 m slab at 0.15 m thick needs 3.6 m³ net before wastage (300 bags at 0.012 m³ per bag, or 3.78 m³ and 315 bags with 5% wastage).

Quick-reference lookup table

Quick reference: Concrete volume and bag counts for a 10 m² pour by depth
Slab / pour depthNet volume (m³)Volume (yd³)25 kg bags (at 0.012 m³)With 5% wastage (m³)
75 mm (0.075 m)0.75 m³0.98 yd³63 bags0.79 m³
100 mm (0.100 m)1.00 m³1.31 yd³84 bags1.05 m³
125 mm (0.125 m)1.25 m³1.64 yd³105 bags1.31 m³
150 mm (0.150 m)1.50 m³1.96 yd³125 bags1.58 m³
200 mm (0.200 m)2.00 m³2.62 yd³167 bags2.10 m³

Before you order

Compare the result with your drawings and supplier information. Keep the original net quantity separate from allowances, and round purchasing quantities only at the ordering stage. Check whether delivery, labour and related materials belong elsewhere in your estimate. If the drawing or specification changes, update the inputs and record the revised basis instead of reusing an earlier total.

For the concepts behind this calculation, read Wastage Factor, Aggregate, Concrete Grade.

Common questions & estimating checks

What formula does the concrete volume calculator use?

Net volume = length × width × depth; order volume = net × (1 + wastage / 100) — Dimensions describe one rectangular solid. Imperial inputs are in feet. Net volume is shown separately from your optional wastage allowance (0% by default). Bag yield is editable: 0.012 m³ for a 25 kg bag and 0.0085 m³ for a 40 lb bag are illustrative defaults, not manufacturer guarantees.

How do you work out a concrete volume example?

A 6 m × 4 m slab at 0.15 m thick needs 3.6 m³ net before wastage (300 bags at 0.012 m³ per bag, or 3.78 m³ and 315 bags with 5% wastage).

Which inputs and units are required for this calculation?

You enter Length (m), Width (m), Depth / thickness (m), Measurement system, Wastage allowance (%), Bag size, Yield per bag (m³). Keep metres and millimetres distinct, and use the header currency selector to display monetary amounts in EUR, GBP, USD or a custom currency code.

What should I check before ordering materials from a concrete volume estimate?

Verify dimensions against approved construction drawings, confirm supplier pack sizes and product yields, and keep net measured quantities separate from cutting or site wastage allowances.