How to use the concrete volume calculator
This calculator helps you calculate the net concrete volume, optional wastage allowance and whole-bag quantity for a rectangular pour. It is intended for quantity takeoffs, early budgets and checks against a measured schedule. Start with the dimensions or quantities for one clearly defined item of work. Enter values in the units shown beside each field; millimetres and metres are not interchangeable.
Dimensions describe one rectangular solid. Imperial inputs are in feet. Net volume is shown separately from your optional wastage allowance (0% by default). Bag yield is editable: 0.012 m³ for a 25 kg bag and 0.0085 m³ for a 40 lb bag are illustrative defaults, not manufacturer guarantees.
Step-by-step takeoff workflow
- Enter your measured dimensions and inputs: Input the project values for Length (m), Width (m), Depth / thickness (m), Measurement system, Wastage allowance (%), Bag size, Yield per bag (m³). Check that every measurement uses the exact unit shown beside its field.
- Review the live quantity and formula calculation: The calculator applies Net volume = length × width × depth; order volume = net × (1 + wastage / 100) immediately in your browser and displays the primary and secondary takeoff figures.
- Carry forward to cost, BoQ, CSV or printable takeoff sheet: Send your calculated quantity directly to Concrete Cost, Markup / Margin or the Bill of Quantities (BoQ) worksheet, or export via CSV and Print / PDF.
Worked example
A 6 m × 4 m slab at 0.15 m thick needs 3.6 m³ net before wastage (300 bags at 0.012 m³ per bag, or 3.78 m³ and 315 bags with 5% wastage).
Quick-reference lookup table
| Slab / pour depth | Net volume (m³) | Volume (yd³) | 25 kg bags (at 0.012 m³) | With 5% wastage (m³) |
|---|---|---|---|---|
| 75 mm (0.075 m) | 0.75 m³ | 0.98 yd³ | 63 bags | 0.79 m³ |
| 100 mm (0.100 m) | 1.00 m³ | 1.31 yd³ | 84 bags | 1.05 m³ |
| 125 mm (0.125 m) | 1.25 m³ | 1.64 yd³ | 105 bags | 1.31 m³ |
| 150 mm (0.150 m) | 1.50 m³ | 1.96 yd³ | 125 bags | 1.58 m³ |
| 200 mm (0.200 m) | 2.00 m³ | 2.62 yd³ | 167 bags | 2.10 m³ |
Before you order
Compare the result with your drawings and supplier information. Keep the original net quantity separate from allowances, and round purchasing quantities only at the ordering stage. Check whether delivery, labour and related materials belong elsewhere in your estimate. If the drawing or specification changes, update the inputs and record the revised basis instead of reusing an earlier total.
For the concepts behind this calculation, read Wastage Factor, Aggregate, Concrete Grade.
Common questions & estimating checks
What formula does the concrete volume calculator use?
Net volume = length × width × depth; order volume = net × (1 + wastage / 100) — Dimensions describe one rectangular solid. Imperial inputs are in feet. Net volume is shown separately from your optional wastage allowance (0% by default). Bag yield is editable: 0.012 m³ for a 25 kg bag and 0.0085 m³ for a 40 lb bag are illustrative defaults, not manufacturer guarantees.
How do you work out a concrete volume example?
A 6 m × 4 m slab at 0.15 m thick needs 3.6 m³ net before wastage (300 bags at 0.012 m³ per bag, or 3.78 m³ and 315 bags with 5% wastage).
Which inputs and units are required for this calculation?
You enter Length (m), Width (m), Depth / thickness (m), Measurement system, Wastage allowance (%), Bag size, Yield per bag (m³). Keep metres and millimetres distinct, and use the header currency selector to display monetary amounts in EUR, GBP, USD or a custom currency code.
What should I check before ordering materials from a concrete volume estimate?
Verify dimensions against approved construction drawings, confirm supplier pack sizes and product yields, and keep net measured quantities separate from cutting or site wastage allowances.