CONCRETE STRUCTURES

Concrete Beam calculator

Concrete and three-sided formwork for beams.

YOUR MEASUREMENTS

Concrete Beam

▱
↻ Results update as you type
YOUR ESTIMATELIVE
Concrete volume
3.6m³
Cubic yards4.709 yd³
Soffit + two sides25.8 m²
CONNECT TO COST, LABOUR & BOQ
Open BoQ ↗

An estimate for planning. Currency selection changes the display symbol only (no exchange-rate conversion). Verify measurements and product specifications before ordering.

THE FORMULAVolume = L × W × D × quantity; formwork = L × (W + 2D) × quantity
ASSUMPTIONSFormwork includes the beam soffit and two long sides. End shutters, intersections and deductions are excluded. Dimensions must not double-count concrete already measured in a slab.
UNDERSTAND YOUR ESTIMATE

How to use the concrete beam calculator

This calculator helps you calculate beam concrete volume and three-sided formwork area. It is intended for quantity takeoffs, early budgets and checks against a measured schedule. Start with the dimensions or quantities for one clearly defined item of work. Enter values in the units shown beside each field; millimetres and metres are not interchangeable.

Formwork includes the beam soffit and two long sides. End shutters, intersections and deductions are excluded. Dimensions must not double-count concrete already measured in a slab.

Step-by-step takeoff workflow

  1. Enter your measured dimensions and inputs: Input the project values for Length (m), Width (m), Depth / thickness (m), Quantity. Check that every measurement uses the exact unit shown beside its field.
  2. Review the live quantity and formula calculation: The calculator applies Volume = L × W × D × quantity; formwork = L × (W + 2D) × quantity immediately in your browser and displays the primary and secondary takeoff figures.
  3. Carry forward to cost, BoQ, CSV or printable takeoff sheet: Send your calculated quantity directly to Concrete Cost, Markup / Margin or the Bill of Quantities (BoQ) worksheet, or export via CSV and Print / PDF.

Worked example

A 6 m × 0.3 m × 0.5 m beam contains 0.9 m³ and has 7.8 m² of three-sided formwork.

Quick-reference lookup table

Quick reference: Concrete volume and 3-sided formwork for a 6.0 m long beam
Beam width × depthConcrete volume (m³)Soffit area (m²)Two sides area (m²)Total 3-sided formwork
250 mm × 400 mm0.60 m³1.50 m²4.80 m²6.30 m²
300 mm × 500 mm0.90 m³1.80 m²6.00 m²7.80 m²
350 mm × 600 mm1.26 m³2.10 m²7.20 m²9.30 m²
400 mm × 700 mm1.68 m³2.40 m²8.40 m²10.80 m²

Before you order

Compare the result with your drawings and supplier information. Keep the original net quantity separate from allowances, and round purchasing quantities only at the ordering stage. Check whether delivery, labour and related materials belong elsewhere in your estimate. If the drawing or specification changes, update the inputs and record the revised basis instead of reusing an earlier total.

For the concepts behind this calculation, read Formwork, Measured Works, Concrete Grade.

Common questions & estimating checks

What formula does the concrete beam calculator use?

Volume = L × W × D × quantity; formwork = L × (W + 2D) × quantity — Formwork includes the beam soffit and two long sides. End shutters, intersections and deductions are excluded. Dimensions must not double-count concrete already measured in a slab.

How do you work out a concrete beam example?

A 6 m × 0.3 m × 0.5 m beam contains 0.9 m³ and has 7.8 m² of three-sided formwork.

Which inputs and units are required for this calculation?

You enter Length (m), Width (m), Depth / thickness (m), Quantity. Keep metres and millimetres distinct, and use the header currency selector to display monetary amounts in EUR, GBP, USD or a custom currency code.

What should I check before ordering materials from a concrete beam estimate?

Verify dimensions against approved construction drawings, confirm supplier pack sizes and product yields, and keep net measured quantities separate from cutting or site wastage allowances.