CONCRETE STRUCTURES

Concrete Wall calculator

Wall volume and formwork on both faces.

YOUR MEASUREMENTS

Concrete Wall

▱
↻ Results update as you type
YOUR ESTIMATELIVE
Concrete volume
2.88m³
Cubic yards3.767 yd³
Two-face formwork28.8 m²
CONNECT TO COST, LABOUR & BOQ
Open BoQ ↗

An estimate for planning. Currency selection changes the display symbol only (no exchange-rate conversion). Verify measurements and product specifications before ordering.

THE FORMULAVolume = length × height × thickness; formwork = 2 × length × height
ASSUMPTIONSThis is a solid rectangular wall without openings. Formwork excludes end stops and the top. Deduct openings separately using a consistent measurement basis.
UNDERSTAND YOUR ESTIMATE

How to use the concrete wall calculator

This calculator helps you calculate concrete volume and two-face formwork area for a solid wall. It is intended for quantity takeoffs, early budgets and checks against a measured schedule. Start with the dimensions or quantities for one clearly defined item of work. Enter values in the units shown beside each field; millimetres and metres are not interchangeable.

This is a solid rectangular wall without openings. Formwork excludes end stops and the top. Deduct openings separately using a consistent measurement basis.

Step-by-step takeoff workflow

  1. Enter your measured dimensions and inputs: Input the project values for Length (m), Height (m), Thickness (m). Check that every measurement uses the exact unit shown beside its field.
  2. Review the live quantity and formula calculation: The calculator applies Volume = length × height × thickness; formwork = 2 × length × height immediately in your browser and displays the primary and secondary takeoff figures.
  3. Carry forward to cost, BoQ, CSV or printable takeoff sheet: Send your calculated quantity directly to Concrete Cost, Markup / Margin or the Bill of Quantities (BoQ) worksheet, or export via CSV and Print / PDF.

Worked example

A 6 m long, 2.4 m high wall at 0.2 m thick contains 2.88 m³. Both faces total 28.8 m².

Quick-reference lookup table

Quick reference: Concrete volume and two-face formwork for a 6.0 m × 2.4 m wall (14.4 m² face)
Wall thicknessConcrete volume (m³)Volume (yd³)Formwork (both faces)Volume per m² of wall
150 mm (0.15 m)2.16 m³2.83 yd³28.80 m²0.15 m³/m²
200 mm (0.20 m)2.88 m³3.77 yd³28.80 m²0.20 m³/m²
250 mm (0.25 m)3.60 m³4.71 yd³28.80 m²0.25 m³/m²
300 mm (0.30 m)4.32 m³5.65 yd³28.80 m²0.30 m³/m²

Before you order

Compare the result with your drawings and supplier information. Keep the original net quantity separate from allowances, and round purchasing quantities only at the ordering stage. Check whether delivery, labour and related materials belong elsewhere in your estimate. If the drawing or specification changes, update the inputs and record the revised basis instead of reusing an earlier total.

For the concepts behind this calculation, read Formwork, Takeoff (Quantity Takeoff), Concrete Grade.

Common questions & estimating checks

What formula does the concrete wall calculator use?

Volume = length × height × thickness; formwork = 2 × length × height — This is a solid rectangular wall without openings. Formwork excludes end stops and the top. Deduct openings separately using a consistent measurement basis.

How do you work out a concrete wall example?

A 6 m long, 2.4 m high wall at 0.2 m thick contains 2.88 m³. Both faces total 28.8 m².

Which inputs and units are required for this calculation?

You enter Length (m), Height (m), Thickness (m). Keep metres and millimetres distinct, and use the header currency selector to display monetary amounts in EUR, GBP, USD or a custom currency code.

What should I check before ordering materials from a concrete wall estimate?

Verify dimensions against approved construction drawings, confirm supplier pack sizes and product yields, and keep net measured quantities separate from cutting or site wastage allowances.