MASONRY & FINISHES

Plastering / Render calculator

From coverage and thickness to mix and bags.

YOUR MEASUREMENTS

Plastering / Render

▦
↻ Results update as you type
YOUR ESTIMATELIVE
Mix volume
0.45m³
Whole bags to buy38 bags
CONNECT TO COST, LABOUR & BOQ
Open BoQ ↗

An estimate for planning. Currency selection changes the display symbol only (no exchange-rate conversion). Verify measurements and product specifications before ordering.

THE FORMULAVolume = area × thickness / 1000; bags = ceil(volume / yield)
ASSUMPTIONSUses a uniform finished thickness and a user-entered mixed yield per bag. The default yield is illustrative; proprietary mixes vary. Substrate levelling, multiple coats and wastage require separate allowances.
UNDERSTAND YOUR ESTIMATE

How to use the plastering / render calculator

This calculator helps you convert an area and coat thickness into a mix volume and bag quantity. It is intended for quantity takeoffs, early budgets and checks against a measured schedule. Start with the dimensions or quantities for one clearly defined item of work. Enter values in the units shown beside each field; millimetres and metres are not interchangeable.

Uses a uniform finished thickness and a user-entered mixed yield per bag. The default yield is illustrative; proprietary mixes vary. Substrate levelling, multiple coats and wastage require separate allowances.

Step-by-step takeoff workflow

  1. Enter your measured dimensions and inputs: Input the project values for Net area (m²), Coat thickness (mm), Yield per bag (m³). Check that every measurement uses the exact unit shown beside its field.
  2. Review the live quantity and formula calculation: The calculator applies Volume = area × thickness / 1000; bags = ceil(volume / yield) immediately in your browser and displays the primary and secondary takeoff figures.
  3. Carry forward to cost, BoQ, CSV or printable takeoff sheet: Send your calculated quantity directly to Concrete Cost, Markup / Margin or the Bill of Quantities (BoQ) worksheet, or export via CSV and Print / PDF.

Worked example

At 30 m², each 10 mm of thickness requires 0.3 m³. A 50 mm screed therefore needs 1.5 m³ before wastage.

Quick-reference lookup table

Quick reference: Wet plaster / render volume and bag counts (at 0.012 m³/bag) for a 20 m² area
Coat thicknessWet mix volume (m³)Volume per m² (L/m²)Bags (at 0.012 m³ yield)Typical application
3 mm skim coat0.06 m³3.0 L/m²5 bagsBoard finish / thin skim
10 mm single coat0.20 m³10.0 L/m²17 bagsInternal backing or monocouche pass
12 mm undercoat0.24 m³12.0 L/m²20 bagsFloat coat on masonry
15 mm two-coat render0.30 m³15.0 L/m²25 bagsStandard external render build-up
20 mm heavy dubbing0.40 m³20.0 L/m²34 bagsUneven masonry background

Before you order

Compare the result with your drawings and supplier information. Keep the original net quantity separate from allowances, and round purchasing quantities only at the ordering stage. Check whether delivery, labour and related materials belong elsewhere in your estimate. If the drawing or specification changes, update the inputs and record the revised basis instead of reusing an earlier total.

For the concepts behind this calculation, read Screed, Wastage Factor, Unit Rate.

Common questions & estimating checks

What formula does the plastering / render calculator use?

Volume = area × thickness / 1000; bags = ceil(volume / yield) — Uses a uniform finished thickness and a user-entered mixed yield per bag. The default yield is illustrative; proprietary mixes vary. Substrate levelling, multiple coats and wastage require separate allowances.

How do you work out a plastering / render example?

At 30 m², each 10 mm of thickness requires 0.3 m³. A 50 mm screed therefore needs 1.5 m³ before wastage.

Which inputs and units are required for this calculation?

You enter Net area (m²), Coat thickness (mm), Yield per bag (m³). Keep metres and millimetres distinct, and use the header currency selector to display monetary amounts in EUR, GBP, USD or a custom currency code.

What should I check before ordering materials from a plastering / render estimate?

Verify dimensions against approved construction drawings, confirm supplier pack sizes and product yields, and keep net measured quantities separate from cutting or site wastage allowances.