CONCRETE STRUCTURES

Concrete Cost calculator

Turn your concrete quantity into a material budget.

YOUR MEASUREMENTS

Concrete Cost

▱
↻ Results update as you type
YOUR ESTIMATELIVE
Material cost
€567
Net concrete volume3.6 m³
Order volume (incl. wastage)3.78 m³
Whole bags to buy315 bags
CONNECT TO COST, LABOUR & BOQ
Open BoQ ↗

An estimate for planning. Currency selection changes the display symbol only (no exchange-rate conversion). Verify measurements and product specifications before ordering.

THE FORMULACost = volume × (1 + wastage / 100) × unit price
ASSUMPTIONSEnter a current supplier quote in your own currency. Bulk pricing uses order volume; bag pricing rounds up to whole bags first. Delivery, minimum loads, pumping, labour and taxes are excluded.
UNDERSTAND YOUR ESTIMATE

How to use the concrete cost calculator

This calculator helps you estimate concrete material costs from your quantity, wastage allowance and supplier price. It is intended for quantity takeoffs, early budgets and checks against a measured schedule. Start with the dimensions or quantities for one clearly defined item of work. Enter values in the units shown beside each field; millimetres and metres are not interchangeable.

Enter a current supplier quote in your own currency. Bulk pricing uses order volume; bag pricing rounds up to whole bags first. Delivery, minimum loads, pumping, labour and taxes are excluded.

Step-by-step takeoff workflow

  1. Enter your measured dimensions and inputs: Input the project values for Volume input, Known volume (m³), Length (m), Width (m), Depth / thickness (m), Wastage allowance (%), Pricing basis, Unit price (selected currency), Yield per bag (m³). Check that every measurement uses the exact unit shown beside its field.
  2. Review the live quantity and formula calculation: The calculator applies Cost = volume × (1 + wastage / 100) × unit price immediately in your browser and displays the primary and secondary takeoff figures.
  3. Carry forward to cost, BoQ, CSV or printable takeoff sheet: Send your calculated quantity directly to Concrete Cost, Markup / Margin or the Bill of Quantities (BoQ) worksheet, or export via CSV and Print / PDF.

Worked example

3.6 m³ net with 5% wastage is 3.78 m³ order volume. At 150 per m³, the material allowance is 567.

Quick-reference lookup table

Quick reference: Order volume and material budget for a 5.0 m³ net pour at 150 per m³
Wastage allowanceOrder volume (m³)Bulk cost (at 150/m³)25 kg bags (0.012 m³)Note on usage
0% (net measure)5.00 m³750417 bagsTheoretical net geometry only
5% allowance5.25 m³787.50438 bagsTypical clean shuttered slab or beam
7.5% allowance5.38 m³806.25448 bagsTypical ground-bearing trench or pad
10% allowance5.50 m³825459 bagsIrregular excavation or pump line loss

Before you order

Compare the result with your drawings and supplier information. Keep the original net quantity separate from allowances, and round purchasing quantities only at the ordering stage. Check whether delivery, labour and related materials belong elsewhere in your estimate. If the drawing or specification changes, update the inputs and record the revised basis instead of reusing an earlier total.

For the concepts behind this calculation, read Unit Rate, Wastage Factor, Rate Build-Up.

Common questions & estimating checks

What formula does the concrete cost calculator use?

Cost = volume × (1 + wastage / 100) × unit price — Enter a current supplier quote in your own currency. Bulk pricing uses order volume; bag pricing rounds up to whole bags first. Delivery, minimum loads, pumping, labour and taxes are excluded.

How do you work out a concrete cost example?

3.6 m³ net with 5% wastage is 3.78 m³ order volume. At 150 per m³, the material allowance is 567.

Which inputs and units are required for this calculation?

You enter Volume input, Known volume (m³), Length (m), Width (m), Depth / thickness (m), Wastage allowance (%), Pricing basis, Unit price (selected currency), Yield per bag (m³). Keep metres and millimetres distinct, and use the header currency selector to display monetary amounts in EUR, GBP, USD or a custom currency code.

What should I check before ordering materials from a concrete cost estimate?

Verify dimensions against approved construction drawings, confirm supplier pack sizes and product yields, and keep net measured quantities separate from cutting or site wastage allowances.